Session day
Mon, Sep 28, 2026
Jobs
Each job in the order it ran. A job that was due shows as missing once its engine's runs from a later day are in without it.
No job run is recorded for this day.
MA · market-analysis
Account MA
What the rules decided (2)
| Strategy | Book | Time (ET) | Symbol | Action | Qty | Why | The rule's numbers |
|---|---|---|---|---|---|---|---|
| — | — | — | SPY | OFF | — | OFF:G2 | 6 numbers
|
| — | — | — | QQQ | OFF | — | OFF:G2 | 6 numbers
|
Warnings
- prices.parquet ends 2026-09-25, BEFORE the 2026-09-28 trade date -- any lane reading it gets a stale regime/factor read. Rebuild: python3 scripts/truthset/build_prices.py
- returns.parquet ends 2026-09-25, BEFORE the 2026-09-28 trade date -- any lane reading it gets a stale regime/factor read. Rebuild: python3 scripts/truthset/build_returns.py
- features.parquet ends 2026-09-25, BEFORE the 2026-09-28 trade date -- any lane reading it gets a stale regime/factor read. Rebuild: python3 scripts/truthset/build_features.py
The session's numbers
- sa
- graded
- 0
- candidates
- 0
- exploration
- 0
- ledger
- graded
- 0
- emitted
- 0
- skipped
- 0
- wb_graded
- 438
- wb_emitted
- 209
- ledger_open
- false
- exploration_emitted
- 0
- exploration_skipped
- 0
- season
- off
- gate_next
- QQQ
- ON
- SPY
- ON
- sb_running
- is_entry_day
- false
- watch_basket
- vol
- 0
- long
- 31
- short
- 178
- conflict
- 91
- available
- true
- sc_candidates
- 0
- sc_exploration
- signals_schema
- d1.6
- index_vol_through
- 2026-10-02
- Record GitHub ledger
Cost model: S-B QQQ iron condor and 7 more
half of each leg's quoted spread plus $0.65 a contract at entry; $0.65 a contract at expiry
For S-B QQQ iron condor, S-B QQQ put spread, S-B SPY iron condor, S-B SPY put spread, S-B QQQ iron condor, exploration, S-B QQQ put spread, exploration, S-B SPY iron condor, exploration and S-B SPY put spread, exploration.
- Record GitHub ledger
Cost model: S-C C1 iron butterfly and 2 more
half of each leg's spread plus $0.65 a contract at entry, the spread quoted from 15:00 to 16:00 ET or, for a wing priced by model, the stock's median option spread over the 20 sessions before, at least 5%; nothing at expiry
For S-C C1 iron butterfly, S-C C2 iron butterfly and S-C C1 iron butterfly, exploration.
- Record GitHub ledger
Cost model: S-C C1 short straddle and 2 more
half of each leg's quoted spread from 15:00 to 16:00 ET plus $0.65 a contract at entry; nothing at expiry
For S-C C1 short straddle, S-C C2 short straddle and S-C C1 short straddle, exploration.
Trades opened or closed
21 trades
| Opened | Closed | Account | Strategy | Symbol | Side | Size | Entry | Exit | P&L | Net P&L | Return | Held | Exit by | Status | Record |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Sep 28, 2026 | Oct 2, 2026 | SIM-V2B | v2b | ADM | long | 27 | 80.379997 | 80.449997 | +$0.80 | — | −0.01% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Sep 30, 2026 | SIM-V2B | v2b | AMZN | long | 8 | 246.149994 | 249.149994 | +$23.00 | — | +1.12% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 8, 2026 | SIM-V2B | v2b | BNY | long | 14 | 148.440002 | 143.610001 | −$68.63 | — | −3.35% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 1, 2026 | SIM-V2B | v2b | CB | long | 6 | 331.369995 | 331.299988 | −$1.41 | — | −0.12% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 1, 2026 | SIM-V2B | v2b | CRM | long | 9 | 227.270004 | 236.690002 | +$83.71 | — | +4.04% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 1, 2026 | SIM-V2B | v2b | DXCM | long | 25 | 86.68 | 86.230003 | −$12.33 | — | −0.62% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 5, 2026 | SIM-V2B | v2b | ELV | long | 5 | 394.589996 | 394.51001 | −$1.39 | — | −0.12% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 2, 2026 | SIM-V2B | v2b | GL | long | 13 | 166.690002 | 165.679993 | −$14.21 | — | −0.71% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 5, 2026 | SIM-V2B | v2b | HOOD | long | 18 | 116.459999 | 114.110001 | −$43.33 | — | −2.12% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 2, 2026 | SIM-V2B | v2b | IBKR | long | 25 | 87.080002 | 88.300003 | +$29.40 | — | +1.30% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 2, 2026 | SIM-V2B | v2b | IRM | long | 19 | 111.050003 | 113.389999 | +$43.38 | — | +2.01% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 8, 2026 | SIM-V2B | v2b | KHC | long | 92 | 23.559999 | 22.48 | −$100.39 | — | −4.68% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 1, 2026 | SIM-V2B | v2b | MCK | long | 2 | 856.289978 | 898.820007 | +$84.16 | — | +4.87% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 5, 2026 | SIM-V2B | v2b | MS | long | 11 | 193.639999 | 190.190002 | −$39.00 | — | −1.88% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 5, 2026 | SIM-V2B | v2b | NEM | long | 18 | 116.050003 | 115.82 | −$5.18 | — | −0.30% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Sep 30, 2026 | SIM-V2B | v2b | NOW | long | 16 | 131.449997 | 134.009995 | +$39.89 | — | +1.85% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Sep 30, 2026 | SIM-V2B | v2b | PSX | long | 8 | 253.550003 | 255.309998 | +$13.06 | — | +0.59% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 7, 2026 | SIM-V2B | v2b | REGN | long | 2 | 752.25 | 742.119995 | −$21.00 | — | −1.45% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | Oct 8, 2026 | SIM-V2B | v2b | SCHW | long | 22 | 98.300003 | 96.870003 | −$32.53 | — | −1.55% | — | close>sma_exit | closed | Local ledger (1) |
| Sep 28, 2026 | — | SIM-V2B | v2b | SPY | long | 73 | 765.609985 | — | — | — | — | — | — | open | Local ledger (1) |
| Sep 28, 2026 | Oct 1, 2026 | SIM-V2B | v2b | VRSN | long | 7 | 282.070007 | 286.899994 | +$32.81 | — | +1.61% | — | close>sma_exit | closed | Local ledger (1) |
- (1) Record Local ledger
Cost model
5 bp a side, filled at the official close. The P&L is after the exit fee only, because the entry fee left the book's cash at entry; the return is after both. Dividends are not credited.